Monthly Archives: June 2015

Emergency Maintenance – UWSP hosting environment

By | 9:37 am 30 June 2015

During the time frame below a WarwickNet engineer will be performing emergency maintenance on one of our servers, to prevent an uncontrolled failure. Planned Work Start (Local UK): 30/06/2015 10:00 Planned Work End (Local UK): 30/06/2015 11:00 This will impact our primary nameserver, however requests should fail over to an alternative nameserver. Our SMTP service… Read More »

Planned Network Maintenance – The Venture Centre

By | 4:13 pm 12 June 2015

During the timeframe stated below, there will be a loss of services at The Venture Centre on The University of Warwick Science Park, whilst WarwickNet engineers complete some maintenance work. This work is taking place to upgrade our switches in the Venture Centre, to provide added capacity and increased resilience. Planned Work Start (Local UK): 20/06/2015… Read More »

Planned Network Maintenance – Dodwells Bridge Industrial Estate

By | 3:01 pm 10 June 2015

During the time frame below a WarwickNet engineer will be performing maintenance on our roadside cabinet at Dodwells Bridge Industrial Estate. This work will cause loss of all services for a brief period of time within the maintenance window. Planned Work Start (Local UK): 11/06/2015 18:30 Planned Work End (Local UK): 11/06/2015 19:30

Emergency Maintenance – Valiant Office Suites

By | 4:52 pm 03 June 2015

During the time frame below a WarwickNet engineer will be performing emergency maintenance on the power feeds at Valiant Office Suites, to prevent an uncontrolled failure. There will be a loss of WiFi and VoIP service at some point during the maintenance window. Planned Work Start (Local UK): 4/06/2015 18:00 Planned Work End (Local UK):… Read More »