Monthly Archives: September 2016

WarwickNet core fibre down between London and Manchester

By | 3:33 pm 28 September 2016

We’re experiencing a loss of service on our core 10G fibre between London and Manchester. No customer impact is expected, as we have a fully redundant national ring with plenty of excess capacity, although we are “at risk” until this redundancy is restored. The fibre supplier believes this is a fibre cut and dispatched an engineer.… Read More »

Planned Maintenance – Tachbrook Park (Olympus Avenue)

By | 9:51 am 28 September 2016

Engineers will be performing planned maintenance on CMLGS85 (Tachbrook Park, Olympus Avenue) to upgrade the backhaul into the cabinet. This will result an outage lasting about 30 minutes during the window below. Planned Work Start (Local UK): 29/09/2016 18:00 Planned Work End (Local UK): 29/09/2016 20:00 We expect the outage to last 30 minutes, however… Read More »

Outage at Stoneliegh Business Park

By | 7:50 pm 23 September 2016

Our monitoring has alerted us to a site outage at Stoneleigh Business Park. We have engineers on route to investigate. We will provide further updates as they become available. [UPDATE 21:50] Our engineers identified a hardware failure and have replaced the effected equipment. All services have now been restored.

Planned Maintenance – University of Warwick Science Park

By | 8:32 pm 20 September 2016

We will be performing maintenance at University of Warwick Science Park to improve our diversity to our access switches around the site. This will may cause small blips in service but an outage is not expected during the maintenance window is as below: Planned Work Start (Local UK): 20/09/2016 21:00 Planned Work End (Local UK):… Read More »

Planned maintenance – Dodwells Bridge Industrial Estate

By | 3:36 pm 20 September 2016

We will be performing maintenance at Dodwells Bridge Industrial Estate to make core configuration changes witch will result in a scheduled reboot at 22:00. This will cause a short outage during the window bellow: Planned Work Start (Local UK): 20/09/2016 22:00 Planned Work End (Local UK): 20/09/2016 22:30 We expect the outage to last 10… Read More »

Planned maintenance – Warren Park Way Industrial Estate

By | 3:12 pm 20 September 2016

We will be performing maintenance at Warren Park Way Industrial Estate to make core configuration changes witch will result in a scheduled reboot at 22:00. This will cause a short outage during the window bellow: Planned Work Start (Local UK): 20/09/2016 22:00 Planned Work End (Local UK): 20/09/2016 22:30 We expect the outage to last… Read More »

WarwickNet core fibre down Birmingham-Manchester

By | 1:19 pm 20 September 2016

We’re experiencing a loss of service on our core 10G fibre between Birmingham and Manchester.  No customer impact is expected, as we have a fully redundant national ring with plenty of excess capacity, although we are “at risk” until this redundancy is restored. The fibre supplier has reported they have had multiple reports on the… Read More »