Planned maintenance at Tachbrook Park and Heathcote Industrial Estate

By | 16:27 30 November 2016

During the time frame stated below, a WarwickNet engineer will be performing some equipment reconfiguration at several street cabinets serving customers on Tachbrook Park and Heathcote Industrial Estate. Work start time: 18:00 06/12/16 Work end time: 20:00 06/12/16 This work will migrate several cabinet to a new redundant ring, increasing resilience to outages.  Services fed from… Read More »

Planned maintenance at BSPA

By | 12:47 25 November 2016

At the time stated below, an engineer will be forcing a failover to our backup supervisor card in one of our core switches at BSPA.  This will cause a brief outage for all connected customers fed from this switch.  This is expected to last no more than a few seconds. Work start time: 23:50 28/11/16… Read More »

WarwickNet Christmas change freeze 2016

By | 15:15 21 November 2016

We will be implementing our Christmas change freeze from close-of-business (18:00) on Friday 16th December 2016 until start-of-business (08:30) on Tuesday 3rd January 2017. During this period we will not be making any configuration changes to our network infrastructure, or installing new customer services.  This is to minimise disruption during the holiday period.  Faults that are identified… Read More »

Planned Network Maintenance – University of Warwick core switch replacement

By | 13:21 21 November 2016

WarwickNet will be performing a planned replacement of a core Layer 3 switch at our University of Warwick POP during the time frame stated below. Planned Work Start (Local UK): 29/11/2016 22:00 Planned Work End (Local UK): 30/11/2016 00:00 This essential work will migrate services from our core Layer 3 switch to a new device.  This will provide… Read More »

Scheduled maintenance: Thurmaston/Barkby Industrial Estate

By | 16:31 18 November 2016

During the timeframe stated below, a WarwickNet engineer will be installing a new access switch in our street cabinet at Thurmaston/Barkby Industrial Estate (EMSTBBS19). Work start time: 22/11/16 19:00 Work end time: 22/11/16 21:00 There will be a loss of service of at some point during the above window.  We expect this to last no… Read More »

Planned Network Maintenance – Warwick Innovation Centre POP relocation

By | 10:40 17 November 2016

WarwickNet will be performing a planned POP migration at Warwick Innovation Centre during the time frame stated below. Planned Work Start (Local UK): 23/11/2016 19:00 Planned Work End (Local UK): 23/11/2016 22:00 This essential work will migrate services from our core Layer 3 switch to a new device in a purpose-built, generator-protected comms room at WIC.  This… Read More »

Reading Core POP offline

By | 08:58 15 November 2016

We have been alerted to a power failure at the data centre where one of our core routers is located.  As a result, this router is offline and all services fed from this POP are currently down.  This will affect the following sites: Bennet Road Industrial Estate Whitley Industrial Estate Winnersh Triangle Industrial Estate This… Read More »