Author Archives: Umar Jawaid

Planned Work Notification – Capability Green Business Park

By | 10:18 01 May 2018

During the maintenance window stated below, a WarwickNet engineer will be working in our cabinet based in Capability Green Business Park, Luton. (SMLT126) Maintenance window start time (Local UK): 02/05/2018 19:00 Maintenance window end time (Local UK): 02/05/2018 21:00 Reason: change from a multi chassis to a single chassis circuit. In the event that your… Read More »

Emergency Planned Work Notification – Woburn Road Industrial Estate

By | 10:09 01 May 2018

During the maintenance window stated below, a WarwickNet engineer will be working in our cabinet based in Woburn Road Industrial Estate. (SMKT28) Maintenance window start time (Local UK): 01/05/2018 19:00 Maintenance window end time (Local UK): 01/05/2018 21:00 Reason: Change from a multi chassis to a single chassis circuit In the event that your service… Read More »

Rescheduled Planned Work Notification -Affecting Multiple sites

By | 17:40 31 January 2018

Planned Work Start (Local UK): 01/03/2018 00:01 Planned Work End (Local UK): 01/03/2018 06:01 Impact: There will be a loss of service at some point during the timeframe stated above whilst our third party supplier carry out the maintenance work. All customer services fed from the following WarwickNet DSLAM(s) will lose connectivity for 30 mins… Read More »

Planned Work Notification – Multiple sites

By | 17:31 25 January 2018

Planned Work Start (Local UK):20/02/2018 00:01 Planned Work End (Local UK): 20/02/2018 06:01 During the maintenance window stated above, a Third Party supplier be carrying out routine maintenance work. All customer services fed from the following WarwickNet DSLAM(s) will lose connectivity for 30 mins during the maintenance window:   CMTIL27 ( Torrington Road Industrial Estate,… Read More »

Mains Power Outage affecting Stratton Business Park

By | 10:46 24 January 2018

Our monitoring has alerted us to a loss of mains power for customers connected to Cabinet SMBWD18, which also supplies SMBWD23 at Stratton Business Park. Cabinet SMBWD18 is currently on backup UPS power, Our monitoring is showing there is approximately 20 minuets before the Backup UPS Battery is exhausted. We will post further updates as… Read More »

Planned Work Notification- DSLAM at CMSHI47

By | 11:55 24 November 2017

Maintenance start time: 18:00 05/12/17 Maintenance end time: 21:00 05/12/17 During the maintenance window stated above, a WarwickNet engineer will be upgrading the DSLAM serving customers at CMSHI47 (Monkspath Business Park, Highlands Road, Solihull, B90 4NZ).  This work was previously scheduled for 14/11/17 but was postponed. We are anticipating a 60 minute loss of service,… Read More »