Planned Network Maintenance – Netplan Point of Presence

By | 3:27 pm 16 November 2015

WarwickNet engineers will be performing some planned maintenance during the times specified below. This work is taking place at our Netplan POP. There will be a short loss of service whilst our engineers upgrade our main core switch at the site. This work is being carried out to provide us with greater capacity and redundancy… Read More »

Planned Network Maintenance – Netplan Point of Presence

By | 2:18 pm 04 September 2015

WarwickNet engineers will be performing some planned maintenance during the times specified below. This work is taking place at our Netplan POP. There will be a short loss of service whilst our engineers upgrade our main core switch at the site. This work is being carried out to provide us with greater capacity and redundancy… Read More »

Notification of disruption to Netplan hosted services and connectivity

By | 4:09 pm 15 September 2014

[UPDATE] – Full service has been restored.  The total downtime lasted from 05:20 – 08:15. Due to the significant roadworks being undertaken at the Tollbar Island, we have been notified by BT that our fibre links into Netplan will need to be relocated.  We have been working tirelessly with BT to try to stagger the… Read More »

Netplan power outage

By | 7:47 am 20 October 2012

At approximately 6.42 this morning, Netplan, Coventry suffered a UPS failure. The effect of this is that all Warwicknet customers hosted at Netplan are currently down and traffic routed via Netplan is unavailable. We have now rerouted all affected customer traffic. Engineers are attending the netplan site to resolve the UPS issue. Update 7:56: Netplan… Read More »

Fibre Upgrades Netplan

By | 3:43 pm 25 June 2012

Wednesday 27th June 21:00 hours. During the above time slot we will be carrying out work on our fibre links into Netplan, we are not expecting there to be any impact to services, however the network will be ‘at risk’ for the duration while we operate in non resilient mode. 27/6/2012 – 21:45 – Update… Read More »

Scheduled fibre maintenance 19/06/2012

By | 5:39 pm 14 June 2012

One of our fibre suppliers will be performing maintenance on 19/06/2012 between 00.01 and 06.00. The Warwicknet network leg that’s subject to maintenance is a backup path to London, so we don’t anticipate this maintenance to be customer-affecting. However, our Coventry-London ring will be degraded so “at risk” during this time. Upgrade: This work was… Read More »

Upcoming Maintenance – Netplan

By | 5:33 pm 07 March 2012

14/03/2012 – 22:00 ->; 00:00 During the above timeslot we will be replacing our core switching/routing infrastructure at Netplan. The switchover should be relatively seamless, however some brief service interruption is unavoidable. We apologise in advance for any inconvenience caused. Regards… Ben Update: This work has now been completed successfully.