Category Archives: Uncategorized

Planned Work Notification – Capability Green Business Park

By | 10:18 01 May 2018

During the maintenance window stated below, a WarwickNet engineer will be working in our cabinet based in Capability Green Business Park, Luton. (SMLT126) Maintenance window start time (Local UK): 02/05/2018 19:00 Maintenance window end time (Local UK): 02/05/2018 21:00 Reason: change from a multi chassis to a single chassis circuit. In the event that your… Read More »

Emergency Planned Work Notification – Woburn Road Industrial Estate

By | 10:09 01 May 2018

During the maintenance window stated below, a WarwickNet engineer will be working in our cabinet based in Woburn Road Industrial Estate. (SMKT28) Maintenance window start time (Local UK): 01/05/2018 19:00 Maintenance window end time (Local UK): 01/05/2018 21:00 Reason: Change from a multi chassis to a single chassis circuit In the event that your service… Read More »

Planned Electrical Work at Umberslade and Birchy Cross Business Centre

By | 17:09 21 March 2018

We have been advised that Western Power Distribution will be carrying out maintenance work that will involve the connecting and disconnecting of a generator which will cause power outages of approximately 10 minutes on two separate days. This will affect our POP at this location. Our POP has a UPS backup, so services fed from… Read More »

Planned Work Notification – Osmaston Park Industrial Estate

By | 17:01 05 March 2018

During the maintenance window stated below, a WarwickNet engineer will be working with a third-party supplier to replace equipment in our cabinet based in Osmaston Park Industrial Estate. This is to increase our capacity on the site as well as repair. WNPW-2018031001 Maintenance window start time (Local UK): 10/03/2018 10:00 Maintenance window end time (Local… Read More »

Planned Work Notification – Basingstoke Exchange

By | 16:52 05 March 2018

During the maintenance window stated below, a WarwickNet engineer will be replacing our UPS in this BT exchange. This will result in an outage on all our point of presence in this area. Planned Works Ref : WNPM-2018030501 Maintenance window start time (Local UK): 06/03/2018 18:00 Maintenance window end time (Local UK): 06/03/2018 22:00 In… Read More »

Planned Work Notification – Cumberland Business Centre

By | 09:36 28 February 2018

During the maintenance window stated below, a WarwickNet engineer will be working with a third-party supplier to replace equipment in our cabinet based in Cumberland Business Centre. Maintenance window start time (Local UK): 01/03/2018 18:00 Maintenance window end time (Local UK): 01/03/2018 22:00 In the event that your service does not come back online following the completion… Read More »

Planned Outage affecting multiple Leicester sites

By | 13:48 07 February 2018

We have a planned outage of some Leicester sites. This outage will be in-between the following times. Planned work start time: 08:00 11/02/18 Planned work end time: 18:00 11/02/18 During the window stated above, our engineers will be moving and re-splicing our fibre to our cabinets. This is needed due to roadworks that will effect… Read More »

Rescheduled Planned Work Notification -Affecting Multiple sites

By | 17:40 31 January 2018

Planned Work Start (Local UK): 01/03/2018 00:01 Planned Work End (Local UK): 01/03/2018 06:01 Impact: There will be a loss of service at some point during the timeframe stated above whilst our third party supplier carry out the maintenance work. All customer services fed from the following WarwickNet DSLAM(s) will lose connectivity for 30 mins… Read More »